- AustraliaEnglish
- BelgiumDutchFrench
- BrasilPortuguese
- BulgariaBulgarian
- CanadaEnglish
- Greater ChinaSimplified ChineseTraditional Chinese
- CzechCzech
- FinlandFinnish
- FranceFrench
- Germany (Global)GermanEnglishFrenchSpanish
- GreeceGreek
- HungaryHungarian
- IndiaEnglish
- ItalyItalian
- IrelandEnglish
- JapanJapanese
- IsraelHebrew
- KoreaKorean
- LuxembourgFrench
- MalaysiaMalaysian
- MexicoSpanish
- Middle East & AfricaEnglish
- NetherlandsDutch
- PolandPolish
- PortugalPortuguese
- RomaniaRomanian
- SlovakiaCzech
- SpainSpanish
- South AmericaSpanish
- South AsiaEnglish
- South East AsiaEnglish
- SwedenSwedish
- ThailandThai
- TurkeyTurkish
- UkraineUkrainian
- United KingdomEnglish
- United States of AmericaEnglish
Commercial PV power plant – Turkey, 2016
Kayseri – 1.144 MW
With its above-average irradiation levels, Kayseri in the Central Anatolia Region is ideally suited for the production of solar power.
4,400 polycristalline modules from IBC and 17 Sunny Tripower 60 inverters, installed in one container, will produce 1,830 MWh per year. This power is fed into the public grid. The plant owner profits from the feed-in tariff of 0.133 $/kWh over the next ten years
Location
Kayseri, Turkey
Commissioning
January 2016
Nominal power
1.144 MWp
Annual energy yield
1,830 MWh
CO2 Savings
About 1,098 tons per year
System Technology
17 Sunny Tripower 60
4,400 IBC Solar modules (260 Watt polycristalline)