- AustraliaEnglish
- BelgiumDutchFrench
- BrasilPortuguese
- BulgariaBulgarian
- CanadaEnglish
- Greater ChinaSimplified ChineseTraditional Chinese
- CzechCzech
- FinlandFinnish
- FranceFrench
- Germany (Global)GermanEnglishFrenchSpanish
- GreeceGreek
- HungaryHungarian
- IndiaEnglish
- ItalyItalian
- IrelandEnglish
- JapanJapanese
- IsraelHebrew
- KoreaKorean
- LuxembourgFrench
- MalaysiaMalaysian
- MexicoSpanish
- Middle East & AfricaEnglish
- NetherlandsDutch
- PolandPolish
- PortugalPortuguese
- RomaniaRomanian
- SlovakiaCzech
- SpainSpanish
- South AmericaSpanish
- South AsiaEnglish
- South East AsiaEnglish
- SwedenSwedish
- ThailandThai
- TurkeyTurkish
- UkraineUkrainian
- United KingdomEnglish
- United States of AmericaEnglish

Utility-scale PV power plant – Turkey, 2015
Osmaniye – 3.2 MW
The 3,2 MWh PV power plant in the Mediterranean Region of Turkey was built in 2015. It is located in hilly terrain at a height of about 1000 meters. Temperatures in this region range between 10 °C and 30 °C.
The SC 800 CP inverters perfectly fit these conditions. They are optimized for outdoor installation and deliver full nominal power at ambient temperatures up to 50 °C.

Location
Osmaniye, Turkey
Commissioning
2015
Specific requirements
1000 m altitude, hilly terrain
Nominal power
3.2 MWp
Annual energy yield
5,310 MWh
System technology
4 SMA Sunny Central 800CP
Jinkosolar modules