- AustraliaEnglish
- BelgiumDutchFrench
- BrasilPortuguese
- BulgariaBulgarian
- CanadaEnglish
- Greater ChinaSimplified ChineseTraditional Chinese
- CzechCzech
- FinlandFinnish
- FranceFrench
- Germany (Global)GermanEnglishFrenchSpanish
- GreeceGreek
- HungaryHungarian
- IndiaEnglish
- ItalyItalian
- IrelandEnglish
- JapanJapanese
- IsraelHebrew
- KoreaKorean
- LuxembourgFrench
- MalaysiaMalaysian
- MexicoSpanish
- Middle East & AfricaEnglish
- NetherlandsDutch
- PolandPolish
- PortugalPortuguese
- RomaniaRomanian
- SlovakiaCzech
- SpainSpanish
- South AmericaSpanish
- South AsiaEnglish
- South East AsiaEnglish
- SwedenSwedish
- ThailandThai
- TurkeyTurkish
- UkraineUkrainian
- United KingdomEnglish
- United States of AmericaEnglish
Solarpark Bickendorf / 7 MW
Utility-Scale PV Power Plant – Germany, 2017
The Bickendorf solar park has been built in three subareas along a highway and supplies about 2,000 neighboring households with clean solar power.
The WES Green GmbH has decided to use Sunny Tripower CORE1 inverters in its project because of some severe dips and rises of the terrain, on both sides of the A60 freeway, in the western part of Germany. The Sunny Tripower CORE1 with its 12 strings allocated on 6 MPPTs allows for maximum energy yields even if the distances between module rows are narrow.
Location
Bickendorf, Germany
Commissioning
2017
Special Feature
The Solarpark is built on three subareas along the highway A60
Nominal power
7.047 MWp
Annual energy yield
7,280 MWh/year
CO2 savings
4,250 tons/year
Area
12 hectare
System Technology
121 Sunny Tripower CORE1
Modules: 26,100